Cable Sizing

A cable must pass three tests — capacity, voltage drop, fault withstand. The biggest wins.

Back to Knowledge Hub
Quick pick (TL;DR)
  • Find the full-load current.
  • Apply the design factor (×1.25 for motors).
  • Divide by derating factors (ambient × grouping) to get the required tabulated capacity Iz.
  • Pick a size whose rated capacity ≥ Iz.
  • Check voltage drop ≤ 5% (3% for lighting).
  • Check short-circuit withstand.
  • Use XLPE/Cu as the default; Al only for large feeders to save cost.

Step 1 — The three checks

CheckCriterionWhy
Current capacityIz ≥ I_design / deratingInsulation temperature
Voltage drop≤ 5% power / 3% lightingEquipment performance
Short-circuitk²S² ≥ I²tConductor survives fault

Step 2 — Worked example

90 kW motor, 400 V, 80 m
Step 1 — Full-load current I = P / (√3 · V · PF · η) I = 90000 / (1.732 · 400 · 0.85 · 0.92) I = 90000 / 541.7 = 166 A Step 2 — Design current motor factor ×1.25 I_d = 166 × 1.25 = 208 A Step 3 — Apply derating ambient 40°C (XLPE) = 0.91 , grouping (2 ckt) = 0.80 combined = 0.91 × 0.80 = 0.728 Check 1 — Capacity installed = base × 0.728 95 mm² : 290 × 0.728 = 211 A ≥ 208 → 95 mm² Check 2 — Voltage drop VD = 0.42 × 166 × 80 / 1000 = 5.6 V %VD = 5.6 / 400 = 1.4% ≤ 5% → OK Check 3 — Short-circuit Smin = √((31,000)² × 0.2) / 143 Smin = 13,864 / 143 = 97 mm² → need 120 mm² Answer 120 mm² XLPE/Cu — short-circuit governs

Three checks — the largest wins. Here short-circuit (31 kA, 0.2 s → 97 mm²) governs, pushing to 120 mm².

Cable sizing calculator

Cable sizing (3-phase, XLPE/Cu)
LV ≤ 1 kV (1.5–630 mm², Cu/Al, XLPE/PVC). MV cables use separate maker tables.
Screening tool only — final design uses project tables & a short-circuit study.

Reference — indicative ampacity (XLPE/Cu)

Size (mm²)Ampacity (A)Volt drop (mV/A/m)
1.51926
2.52616
4359.5
6456.4
10623.8
16852.4
251121.5
351381.1
501680.81
702130.57
952900.42
1203400.33
1503900.27
1854460.22
2405280.18
3006080.15
4007260.115
5008270.10
6309410.087

Indicative IEC 60364 free-air values — apply derating & confirm with the project schedule.

Decision flow

1. Full-load current → ×1.25 (motor)
2. ÷ derating → required Iz
Pick sizeSmallest size with ampacity ≥ Iz
Check VD ≤ 5%If fail → upsize
ConfirmShort-circuit withstand
Result: the largest size demanded by capacity, voltage drop or fault current wins.

Step 3 — Conductor & insulation

  • Cu default; Al for large feeders.
  • XLPE default; PVC legacy.
  • Method & derating strongly change capacity.

Common mistakes

  • No ×1.25 / no derating.
  • Ignoring voltage drop on long runs.
  • Ignoring grouping on shared trays.

Requisition & datasheet

  • Load data, conductor, insulation, method.
  • Size, capacity, Iz, %VD, fault, standard.

Frequently asked questions

What should I know about Cable Sizing?

1) Find full-load current. 2) Apply design factor (×1.25 for motors). 3) Divide by derating factors (ambient × grouping) to get the required tabulated capacity Iz. 4) Pick a size whose rated capacity ≥ Iz. 5) Check voltage drop ≤ 5% (3% for lighting). 6) Check short-circuit withstand. Use XLPE/Cu as the default; Al only for large feeders to save cost.

Which standards or codes apply?

IEC 60364-5-52 (current-carrying capacity & derating), IEC 60502 (power cables), IEC 60909 (fault current), BS 7671, NEC Article 310.

Standards — IEC 60364-5-52; IEC 60502; IEC 60909; BS 7671; NEC 310.